Monday, October 24, 2005

Day 144. Hip high

A bit of a wet day, more tea-in-the-kitchen stuff.

Woken early by the noise of blocks being moved, as Paul and Pete charge ahead with the work. This goes on till ab out 9:30 when rain stops play. Apparently it restarts a bit later and finally stops at lunchtime.

But the side wall is now about hip-high, or two sheets of insulation high, and the piles of blocks in the driveway are gone (built in, or stacked on the side) and there are only two piles of bricks left.