Day 164: Deliveries and a radiator

Rather early on a big Ridgeons lorry turns up with some roof timbers; however no-one is around to use them. Then an even bigger Ikea lorry arrives to deliver a pile of kitchen type bits, which all get carried through to the new room while I'm still a-bed. Then Pete arrives and takes about 15 mins to put the new radiator in place. Then he settles down to the main task, which is draining the system so he can connect it up via the living room. We leave him to it: with the front door open to let the radiator drain hose out, its cold. When I return, its all done, neat and tidy, Pete is gone, and its warm again.