Monday, June 12, 2006

Day 311. Windows, shower, door

A hot morning. Leave Tim and Barry ripping out the windows at the back and replacing with new; Pete tPP putting in the new shower door; and Pete addressing the conversion of the front door to a window.

Back home (after they have left): try out the shower. Well its a lot better, and in usual use fine; but if the spray is pointed at the bottom of the door it leaks. Hmm. Windows seem to be in OK; there is some decorating filler to make good.

Don't think Pete tPP has done anything to investigate the "friday leak" which is gone now. The other half of the door (well, 1/4) is here; also tap not changed in bathroom. I rather suspect he found it too hot to work today.

0 Comments:

Post a Comment

<< Home